The constructions of Suramadu bridge were initiated from both sides; Kenjeran (Surabaya) and Labang (Madura).
The length of the bridge is ±5.4 Kms (±3.4 miles) and, once finished, it’ll be the longest bridge in Indonesia & the first one that connects two islands together. This project estimatedly costs 3,270 million Rupiahs and is planned to launch by September 2008.
The appropriateness of Suramadu Analisis Bridge of the appropriateness of economics was carried out with the assumption that the construction cost of bridge was 2,3 trillion indicators that were used was BCR with the level of the interest was 12 % and the age of the plan 30 years. From the study that was carried out was received by the BCR value 10,1 that indicated that this bridge was appropriate economically. (BenefitCost the ratio) .
With EkonomiAmdalDari the Analysis document of the Impact of the Environment (Amdal), afterwards was followed up by the Andal implementation. The Andal study was for Suramadu Bridge carried out by BPPT in 1992. Together with the postponement of time and the change that happened, for postponement time as well as the No Government Regulation 27. So GoodLuck for Suramadu Bridge in Jatim.
Suramadu Bridge
Posted by .. at 2:58 PM
Labels: Town Planning
Subscribe to:
Post Comments (Atom)
Custom Search
Category Article's English
- A News
- Advertising
- Antivirus
- Bank
- BBM
- Beasiswa
- Bencana
- Books
- Business
- Campus
- Career
- Celluler
- Economic
- Event Schedule
- Food
- Healthy
- Hotel
- Hukum
- Linux
- Marketing
- Money
- Movie
- Music
- My Day
- Perayaan
- Politik
- President
- Scientist
- Selebritys
- Sosok
- Sport
- Technology
- The Mining
- The Miracle
- Town Planning
- Tragedy
- Trends
- Tutorial Adsense
- Tutorial Blog
- Tutorial Business Online
- Tutorial Optimalisasi Situs
- Unique
- Website hack
- Words of wisdom
0 comments:
Post a Comment